
The center will close at 5 p.m. April 4 and is scheduled to reopen the morning of April 15.
The repairs will require draining the pool and spreading a protective covering across the pool surface.


The center will close at 5 p.m. April 4 and is scheduled to reopen the morning of April 15.
The repairs will require draining the pool and spreading a protective covering across the pool surface.